User:Andre/BS-future

From Publication Station

Beyond Social Re-design plan

March 2016.

Development of a front-end overview page

  • people: Andre, Lucia, Noemi and Bo (WdKA Graphic Design 1st year students)
  • duration: 3 days
  • dates (possible): any 3 days for week from 18-22April(Andre unavailable on 18) and 11-15April (less advisable date)
  • fees: Lucia 1600€; Andre (2days)
  • deadline: end of April

pending questions

  • students participation?
  • Lucia's schedule?

workshop structure

  • Day 1: presentation of project, how's it working, aims, prototype front-end a few design option, prototype code, editors feedback (1 hour)
  • Day 2: implementation of design and code
  • Day 3: tests, refinement, editors feedback (1 hour)

wishlist

  • random image from the issue.

Front-end design for issue 2,3

  • dates: 9-13May
  • duration: 4 days
  • possible modes collaboration:
    • students from wdka + Lucia + publishing lab interns; active collaboration from Publishing lab (?)
    • external designers + Lucia(?)
  • deadline: end of June finished
  • Issue titles
    • 2: Education
    • 3: Radical Reframing
  • pages:
    • index page,
    • article page.

For issue 2: article titles and images from article appear next to each other in index.


Image based template

  • image based template: html structure, css, JS, added category in wiki (that identifies this)
  • duration 3days.


misc changes

  • include category "issue 3" wiki and accommodate it to the front end.
  • change name of issue 2
  • metadata page ofr each issue to exist in a wiki page - so it can scrapped to the frontend
  • Andre will do it


Iris

  • Teachers start using the wiki
  • Past minors have been uploading their work.

Graphic Design students collaborations

  • use: editorial module as a design content

plan - dates

  • development week to 11- 22 april?

Andre can do: 11,12 + 19,20,21

front-end

Identity - for issue 2 (student from Y1 GD involvement)

Page structure (student from Y1 GD involvement):

  1. splash page - about
  2. menu page - containing:
    1. image links to each issue
    2. meta information (about)

Front-end architecture - issue based architecture (7days = 65 hours) - April with Lucia.

  • new issues added to the wiki
Iris will make scheme/plan
Andre will respond with plan 
  • (Not for next issue) content structure - text or image prominence - how is an article displayed - (5 days)

backend

Arjen will become administrator

print

back-end (wiki)

  • wiki administrator: Arjen (creating categories, monitoring) - 4 hours
  • teachers professionalization workshop - K3 - to make students editors

right own

  • category for issue 3 - "Radical Reframing"
    • category issue as names - difficult - use captions
  • change in name from issue 2 to "Social Art and Design Education"



system for BS publishing

In order to stream line the process of publishing BS it is important to have a clear map of the aspects and strategies involved in publishing.

Models of publishing issues

  • freezing -
  • ongoing the current issue
  • ongoing for all issues

simplify

focus on the current issue