User:Andre/BS-future

From Publication Station

Recipe - what takes to make a new issue

plan for every issue

changes

  • Issues are ongoing


plan for current issue

Iris

  • Teachers start using the wiki
  • Past minors have been uploading their work.

Graphic Design students collaborations

  • use: editorial module as a design content

plan - dates

  • development week to 11- 22 april?

Andre can do: 11,12 + 19,20,21

front-end

Identity - for issue 2 (student from Y1 GD involvement)

Page structure (student from Y1 GD involvement):

  1. splash page - about
  2. menu page - containing:
    1. image links to each issue
    2. meta information (about)

Front-end architecture - issue based architecture (7days = 65 hours) - April with Lucia.

  • new issues added to the wiki
Iris will make scheme/plan
Andre will respond with plan 
  • (Not for next issue) content structure - text or image prominence - how is an article displayed - (5 days)

backend

Arjen will become administrator

print

back-end (wiki)

  • wiki administrator: Arjen (creating categories, monitoring) - 4 hours
  • teachers professionalization workshop - K3 - to make students editors

right own

  • category for issue 3 - "Radical Reframing"
    • category issue as names - difficult - use captions
  • change in name from issue 2 to "Social Art and Design Education"



system for BS publishing

In order to stream line the process of publishing BS it is important to have a clear map of the aspects and strategies involved in publishing.

Models of publishing issues

  • freezing -
  • ongoing the current issue
  • ongoing for all issues

simplify

focus on the current issue